Solve the following and check with the answers given at the end.

1. It was calculated that 75 men could complete a piece of work in 20 days. When work was scheduled to commence, it was found necessary to send 25 men to another project. How much longer will it take to complete the work?

2. A student divided a number by 2/3 when he required to multiply by 3/2. Calculate the percentage of error in his result.

3. A dishonest shopkeeper professes to sell pulses at the cost price, but he uses a false weight of 950gm. for a kg. His gain is …%.

4. A software engineer has the capability of thinking 100 lines of code in five minutes and can type 100 lines of code in 10 minutes. He takes a break for five minutes after every ten minutes. How many lines of codes will he complete typing after an hour?

5. A man was engaged on a job for 30 days on the condition that he would get a wage of Rs. 10 for the day he works, but he have to pay a fine of Rs. 2 for each day of his absence. If he gets Rs. 216 at the end, he was absent for work for ... days.

6. A contractor agreeing to finish a work in 150 days, employed 75 men each working 8 hours daily. After 90 days, only 2/7 of the work was completed. Increasing the number of men by ________ each working now for 10 hours daily, the work can be completed in time.

7. what is a percent of b divided by b percent of a?
(a) a (b) b (c) 1 (d) 10 (d) 100

8. A man bought a horse and a cart. If he sold the horse at 10 % loss and the cart at 20 % gain, he would not lose anything; but if he sold the horse at 5% loss and the cart at 5% gain, he would lose Rs. 10 in the bargain. The amount paid by him was Rs._______ for the horse and Rs.________ for the cart.


9.If a light flashes every 6 seconds, how many times will it flash in ¾ of an hour?

10. If point P is on line segment AB, then which of the following is always true?
(1) AP = PB (2) AP > PB (3) PB > AP (4) AB > AP (5) AB > AP + PB


1. Answer:
30 days.


Explanation:
Before:
One day work = 1 / 20
One man’s one day work = 1 / ( 20 * 75)
Now:
No. Of workers = 50
One day work = 50 * 1 / ( 20 * 75)

The total no. of days required to complete the work = (75 * 20) / 50 = 30

2. Answer:
0 %


Explanation:
Since 3x / 2 = x / (2 / 3)

3. Answer:
5.3 %


Explanation:
He sells 950 grams of pulses and gains 50 grams.
If he sells 100 grams of pulses then he will gain (50 / 950) *100 = 5.26

4. Answer:
250 lines of codes

5. Answer:
7 days


Explanation:
The equation portraying the given problem is:
10 * x – 2 * (30 – x) = 216 where x is the number of working days.
Solving this we get x = 23
Number of days he was absent was 7 (30-23) days.

6. Answer:
150 men.


Explanation:
One day’s work = 2 / (7 * 90)
One hour’s work = 2 / (7 * 90 * 8)
One man’s work = 2 / (7 * 90 * 8 * 75)

The remaining work (5/7) has to be completed within 60 days, because the total number of days allotted for the project is 150 days.

So we get the equation
(2 * 10 * x * 60) / (7 * 90 * 8 * 75) = 5/7 where x is the number of men working after the 90th day.We get x = 225
Since we have 75 men already, it is enough to add only 150 men.

7. Answer:
(c) 1


Explanation:
a percent of b : (a/100) * b
b percent of a : (b/100) * a
a percent of b divided by b percent of a : ((a / 100 )*b) / (b/100) * a )) = 1

8. Answer:
Cost price of horse = Rs. 400 & the cost price of cart = 200.


Explanation:-
Let x be the cost price of the horse and y be the cost price of the cart.
In the first sale there is no loss or profit. (i.e.) The loss obtained is equal to the gain.

Therefore (10/100) * x = (20/100) * y

X = 2 * y -----------------(1)
In the second sale, he lost Rs. 10. (i.e.) The loss is greater than the profit by Rs. 10.

Therefore (5 / 100) * x = (5 / 100) * y + 10 -------(2)


Substituting (1) in (2) we get
(10 / 100) * y = (5 / 100) * y + 10
(5 / 100) * y = 10
y = 200
From (1) 2 * 200 = x = 400


9. Answer:
451 times.


Explanation:
There are 60 minutes in an hour.
In ¾ of an hour there are (60 * ¾) minutes = 45 minutes.
In ¾ of an hour there are (60 * 45) seconds = 2700 seconds.
Light flashed for every 6 seconds.
In 2700 seconds 2700/6 = 450 times.
The count start after the first flash, the light will flashes 451 times in ¾ of an hour.

20. Answer:
(4)


Explanation:
P
A B
Since p is a point on the line segment AB, AB > AP